Arts + Entertainment
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
discover
Education
Colleges + Universities
Private + Specialty Schools
Public K-12
discover
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
discover
Government
Municipal
State
Federal
discover
Healthcare
Senior Care
Hospitals
Outpatient Facilities
discover
Industrial
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
discover
Ports + Coastal
Berths, Piers + Wharves
Bulkheads
Esplanades
Ferry Landings, Ship Terminals
Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
discover
Public Infrastructure
Bikeways + Trails
Garage + Parking Facilities
Park + Recreational Spaces
Streetscapes
Utility Infrastructure
Water + Wastewater
discover
Real Estate Development
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
discover
Transportation
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
discover
Floating Harbor Wetland
Multimodal Processing Plant
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
Tiffany Crane
LaGuardia Airport Terminal B
NYC Ferry
Orlando Airport LED Displays
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.
Demolition For Rebuild of Lasker Pool and Rink
Rendering courtesy Susan T. Rodriguez Architecture | Design and the Central Park Conservancy
Recreational Spaces

Upcoming Opening of
the Davis Center at Harlem Meer

Replacing the original 1966 Lasker Pool and Rink, the Central Park Conservancy’s reimagined Davis Center represents a $160 million investment in community recreation and access to nature. Seamlessly integrated into the surrounding landscape, the Davis Center features a full-scale ice rink, an additional skating area on the Meer, a larger-than-Olympic-size pool, and a new outdoor spray pad.

Our engineers played an important role in the early stages of this transformation. They developed the demolition plans for the original facility, including the strategic capping of utilities and initial soil erosion control to ensure a safe and environmentally responsible process.

To make the facility accessible year-round, our entertainment team also designed a unique scaffold system inside the pool area. This adaptable system provides a flat surface for ice in the winter and can be covered with synthetic grass in the spring and fall, creating additional recreational space for the community.