Solutions From Concept To Completion
Structural Engineering
Site Solutions From Concept To Completion
Civil Engineering
Solutions Where Land Meets Water
Marine + Coastal
Solutions From Procurement To Completion
Construction Engineering
Structural + Mechanical Specialists
Entertainment Engineering
Consultation, Design + Inspection
Facade + Building Envelope
Soil + Foundation
Geotechnical Engineering
Investigation + Litigation Support
Forensic Engineering
Arts + Entertainment
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
discover
Education
Colleges + Universities
Private + Specialty Schools
Public K-12
discover
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
discover
Government
Municipal
State
Federal
discover
Healthcare
Senior Care
Hospitals
Outpatient Facilities
discover
Industrial
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
discover
Ports + Coastal
Berths, Piers + Wharves
Bulkheads
Esplanades
Ferry Landings, Ship Terminals
Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
discover
Public Infrastructure
Bikeways + Trails
Garage + Parking Facilities
Park + Recreational Spaces
Streetscapes
Utility Infrastructure
Water + Wastewater
discover
Real Estate Development
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
discover
Transportation
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
discover
Floating Harbor Wetland
Multimodal Processing Plant
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
Tiffany Crane
LaGuardia Airport Terminal B
NYC Ferry
Orlando Airport LED Displays
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.
June 24, 2019

Press Release

McLaren Engineering Group Lends Expert Services to Daring Tightrope Walk in Times Square

Firm provides structural engineering for the tightrope walk performance that saw acrobat Nik Wallenda, sister Lijana, cross paths 25 stories above ground

NEW YORK, N.Y., June 24, 2019 – Notorious daredevils and high wire artists Nik and Lijana Wallenda defied odds on Sunday by simultaneously traversing a tightrope suspended 25 stories (over 250 feet) off the ground in Times Square. To ensure the stunt’s success, full-service firm McLaren Engineering Group offered its entertainment expertise, providing structural engineering services for the Dick Clark Productions (DCP) event.

McLaren Engineering Group worked closely with the design engineer, R. Scott Lewis, Nik Wallenda and his team of riggers to engineer the steel wire tightrope, just three-quarters of an inch wide. The rope spanned north-south for five blocks and was anchored to a roof beam of 1 Times Square and to existing maintenance davits on 2 Times Square. McLaren also worked with iDEKO and specialty contractors to engineer a number of platforms and camera mounts at various locations on buildings throughout Times Square.

The Woodcliff Lake, N.J.-based firm worked with a tightrope pretensioned to over 20,000 pounds. The assembly for the event also included overhead safety cables and lateral stabilizer cables spaced along the tightrope at roughly 30-foot intervals to keep it from swaying during the walk. These stabilizers were tied off to building and sign structures on the series of buildings lining Times Square.

McLaren also conducted inspections and signed off on the integrity of all the rigging, platforms and camera mounts prior to the performance. Several weeks before the event, McLaren observed proof load testing of the 2 Times Square davits to confirm that they were suitable for anchoring the tightrope and safety lines.

“To make this spectacular performance happen, McLaren Engineering Group worked closely with Nik Wallenda and a great team of technicians and production people,” said Bill Gorlin, Vice President – Entertainment Division, McLaren Engineering Group. “With proper design, engineering, construction, inspection and execution, this thrilling stunt made history for the city, the Wallendas and all the people involved.”

The Wallenda siblings, seventh-generation additions to “The Flying Wallendas” circus troupe, worked with a robust production crew prior to the event, which saw them crossing paths with crowds watching below.

Both performers wore safety harnesses attached to the safety cables, a precaution required by both New York City and ABC, which broadcast the breathtaking pursuit.

Nik Wallenda holds nine Guinness World Records for acrobatic feats. In 2012, he became the first person to walk a tightrope spanning Niagara Falls. His sister, Lijana, suffered serious injuries after a 2017 rehearsal incident that also injured four other acrobats. The June 23 performance, which aired live, marked Lijana’s first stunt since the setback. It required her to slip past her brother at the midway point of a wire that also featured a sharp incline from end to end.

About McLaren Engineering Group

For over 40 years, McLaren Engineering Group has provided innovative, customized engineering solutions for more than 15,000 projects. With over 250 employees in 10 offices, McLaren is licensed in 49 states and serves 10 key markets. With experts in numerous engineering disciplines – and a passion for creativity and out-of-the-box thinking – McLaren can address any project’s specific range of design requirements with technical excellence. McLaren has offices in Woodcliff Lake, N.J., New York City, N.Y., Albany, N.Y., Philadelphia, Pa., Lehigh Valley, Pa., Middletown, Conn., Baltimore, Md., Roswell, Ga., Orlando, Fla., and San Luis Obispo, California.