Solutions From Concept To Completion
Structural Engineering
Site Solutions From Concept To Completion
Civil Engineering
Solutions Where Land Meets Water
Marine + Coastal
Solutions From Procurement To Completion
Construction Engineering
Structural + Mechanical Specialists
Entertainment Engineering
Consultation, Design + Inspection
Facade + Building Envelope
Soil + Foundation
Geotechnical Engineering
Investigation + Litigation Support
Forensic Engineering
Arts + Entertainment
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
discover
Education
Colleges + Universities
Private + Specialty Schools
Public K-12
discover
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
discover
Government
Municipal
State
Federal
discover
Healthcare
Senior Care
Hospitals
Outpatient Facilities
discover
Industrial
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
discover
Ports + Coastal
Berths, Piers + Wharves
Bulkheads
Esplanades
Ferry Landings, Ship Terminals
Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
discover
Public Infrastructure
Bikeways + Trails
Garage + Parking Facilities
Park + Recreational Spaces
Streetscapes
Utility Infrastructure
Water + Wastewater
discover
Real Estate Development
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
discover
Transportation
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
discover
Floating Harbor Wetland
Multimodal Processing Plant
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
Tiffany Crane
LaGuardia Airport Terminal B
NYC Ferry
Orlando Airport LED Displays
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.

Engineering NYC Fashion Week 2025

Creating the perfect runway experience for NYC Spring-Summer 2025 Fashion Week required precise engineering behind the scenes, and McLaren’s Entertainment and Marine Engineering teams were integral to bringing the vision to life for some of the industry’s biggest names.

This season, we provided custom structural engineering solutions for a range of high-profile events, transforming both indoor and outdoor spaces around NYC into unforgettable fashion venues.

From ground-supported truss systems for lighting, sound, and false ceilings at Tory Burch, Khaite, and various luxury fashion brands, to an outdoor LED screen setup for various designers at Rockefeller Center, each show required specialized rigging, temporary structures, and detailed calculations by our Entertainment Engineering team to ensure a flawless and creative execution.

Our Marine Engineering team also supported Tommy Hilfiger at Pier 17, performing a temporary mooring analysis for the Staten Island ferry to ensure safe anchorage and hardware support for the show’s unique venue.

Spring-Summer 2025 Fashion Week Shows

Engineering NYC Fashion Week 2025

Confidential Luxury Fashion Brand

The luxury brand’s largest show of the 2024 season took place in a tented venue on Long Island. Our team designed and engineered a comprehensive truss system that supported the entire fit-out, including lighting, sound, and a false ceiling.

Engineering NYC Fashion Week 2025 for Khaite

Khaite

Khaite’s runway featured multiple runs of truss, supporting lighting and sound along both sides and the end of the runway. McLaren provided structural support to ensure stability and safety throughout the event.

Engineering NYC Fashion Week 2025 For Tory Burch

Tory Burch

For Tory Burch’s show, McLaren engineered a ground-supported truss system designed to support lighting and sound, creating the perfect indoor setting for the designer’s iconic collection.

Engineering NYC Fashion Week 2025 for Rockefeller Center Live LED Screen Streaming

Rockefeller Center Show

At Rockefeller Center, McLaren supported an outdoor LED screen setup for a series of events featuring various designers. Our team worked to ensure the structure was seamlessly integrated into the iconic outdoor space.

Temporary Mooring Analysis for Tommy Hilfiger's NYC Fashion Week 2025 Show

Tommy Hilfiger

For Tommy Hilfiger's NYC Fashion Week event at Pier 17, McLaren’s Marine Engineering team conducted a temporary mooring analysis to ensure the Staten Island ferry could be safely anchored. Acting as Pier 17’s representative, we verified that the existing anchorage and hardware were sufficient for this unique venue setup.