Arts + Entertainment
Live Performances
Museums + Art Displays
Pop-Ups
Signage
Studios + Sound Stages
TV + Film Production
Theaters
Theme Parks + Playplaces
discover
Education
Colleges + Universities
Private + Specialty Schools
Public K-12
discover
Energy
Solar Energy
Transmission Infrastructure
Wind Energy
Oil + Gas
discover
Government
Municipal
State
Federal
discover
Healthcare
Senior Care
Hospitals
Outpatient Facilities
discover
Industrial
Heavy Industrial
Warehouse + Distribution Centers
Industrial Ports + Terminals
discover
Ports + Coastal
Berths, Piers + Wharves
Bulkheads
Esplanades
Ferry Landings, Ship Terminals
Floating Structures
Ports + Terminals
Marinas + Breakwaters
Transfer Stations
discover
Public Infrastructure
Bikeways + Trails
Garage + Parking Facilities
Park + Recreational Spaces
Streetscapes
Utility Infrastructure
Water + Wastewater
discover
Real Estate Development
Commercial
Community Facilities
Mixed-Use
Multifamily Residential
discover
Transportation
Airports
Bridges
Ports + Terminals
Rail Transportation
Roads + Highways
Ropeway + Linear Infrastructure
discover
Floating Harbor Wetland
Multimodal Processing Plant
416 + 420 Kent Dynamic Highrise
Wittpenn Bridge
Tiffany Crane
LaGuardia Airport Terminal B
NYC Ferry
Orlando Airport LED Displays
A leading full-service engineering firm renowned for our trusted, high quality, and innovative approach to solving complex challenges.

Tina Turner Live in Concert Tour

For Tina Turner’s world tour “Tina: Live in Concert”, McLaren Engineering Group provide structural and mechanical engineering services for a new stage set combined with a custom performer “boom lift” revamped from the 24/7 World Tour, a project McLaren worked in conjunction with Private Dancer Productions and The Mark Fisher Studio.

Concert Tour Stage Elements

McLaren performed entertainment engineering, including finite element analysis for complicated mechanical assemblies. In order to complete the evaluation, McLaren engineers evaluated all of the stage elements from the Main Stage to the modified JLG man-lift used as a performer lift.

Tina Turner’s 24/7 tour included a hydraulic platform lift that was constructed of five-stage telescoping hydraulic actuators that are constantly pressurized, each of which works in conjunction with a corresponding cable winch. The cylinders provide a constant and consistent upward push on the performer platform and maintain stability, while the winch pays out and retracts the cable to raise and lower the platform. Active telescoping hydraulic cylinders were not considered because they would have resulted in jolts as each stage engaged a different position and thus would not have been able to provide the lateral stability needed for this lift.

Signature Boom Lift

Additionally, McLaren re-evaluated Tina’s signature boom lift. The lift consisted of a 54 ft cantilevered arm that rose out of the stage and then pivoted Tina back and forth over the audience below, thereby creating a thrilling, personal interaction between the performer and her audience.

Location
Worldwide
Year Completed
2009
Client
Private Dancer, Inc.

Image Credit for all Images: Steve Jennings